Water supply
Contract | Nature of work | Cost | Client | Client's reference | Period |
Construction of Rusororo water supply system in Rusororo Sector Kabuga ADP |
Tracing 16.1 km of water pipeline
- Supply and laying of 4.5km of 790x 110PN16 pipes |
35,680,840 RWF |
World Vision |
World Vision Rwanda P.O. Box 1419 Kigali |
completed in September 2014 |
Construction
S/N | Contract | Nature of works | Amount | Client | Client's reference | Period |
1. | Construction of a church of Eglise Evangelique des Amis at Kimironko | Construction | 154,249,756 RWF |
Eglise Évangélique des Amis. |
Eglise Évangélique des Amis. |
Completed in 2013 |
2. |
Construction of 10 public latrines in different ADPs of the Northern zone. |
Construction | 28,835,660 RWF | Word Vision | World Vision Rwanda | July 2012 |
3. | Construction of Biogas-Rec quarters near the office in Urugero agglomeration,Kamutwa cell, Kacyiru sector, Gasabo district. | Construction | Self (Biogas-Rec) | See adress | April 2010 | |
4. | Construction of residential house at Ruyenzi in Kamonyi district. | Construction | Self (Biogas-Rec D/G's home) | See address | May 2011 | |
5. | Construction of residential house at Ruyenzi in Kamonyi district. | Construction | Self (Biogas-Rec D/G's home) | See address | Under construction | |
6. | Construction of biogas Demonstration site and workshop in Urugero agglomeration, Kamutwa cell, Kacyiru sector, Gasabo district. | Construction | Self (Biogas-Rec) | See address | Under cnstruction |
Construction of rainwater harvesting tanks and accessories
Contract | Nature of works | Amount | Client | Client's reference | Period | |
1. | Construction works for reinforced conrete water tank of 125m3 in Maraba ADP, Huye district |
Construction of water tank Water distribution |
31,970 186 RWF |
World Vision |
World vision Rwanda |
April 2014 |
2. | Construction works for reinforced conrete water tank of 125m3, construction of 4 manholes, 4 water stands, 2 collection chambers, 2 load breakers and 2 masonry walls in Nyarutovu ADP, Gakenke district | Construction of water tank Water distribution |
54 347 170 RWF |
World Vision |
World Vision Rwanda |
April 2014 |
3. | Construction of 11 concrete water tanks in Kahi ADP | Construction of water tank Water distribution |
15 225 810 RWF | World Vision | World Vision Rwanda | June 2014 |
4. | Construction of rainwater harvesting systems in selected public schools | Construction of water tanks Water distribution |
136 401 946 RWF | Rwanda Natural Resources Authority | Rwanda Natural Resources Authority | March 2012 |
5. | Rehabilitation and provision of facilities (rainwater harvesting tanks, kitchens), for 105 houses to make them environmental friendly in Muyebe agglomeration, Ruhango cell, Rongi Sector, Muhanga district | Construction of water tanks Water distribution |
198 432 340 RWF | Rwanda Environment Management authority (REMA) | Rwanda Environment Management authority (REMA) | Oct 2012 |
6. | Construction works of pilot communal rainwater harvesting system in Rusheshe cell, Masaka sector, Kicukiro district | Construction of water tanks Water distribution |
51 899 750 RWF | Water for People | Water For People Rwanda | Oct 2015 |
Construction in Burundi
S/N
Contract | Nature of works | Amount | Client | Client's reference | Period | |
1. | Realisation de pose des carreaux dans la salle, la terrasse, et dans la cuisine de l'Hotel Safari Lodge d Muyinga |
Construction |
20 000 000 FBU |
Hotel Safari Lodge de Muyinga | Hotel Safari Lodge Muyinga | Jun 2008 |
2. | Construction d'un presbytère à Kamaramagambo dans la commune de Butihinda en province de Muyinga |
Construction | 89 122 743 FBU |
Paroisse de Kamaramagambo | Economat-Diocèse de Muyinga DS 123 Bujumbura |
Dec 2009 |
Installation of rainwater harvesting systems
Contract | Nature of works | Amount | Client | Client's reference | Period | |
1. | Construction de 6 citernes d'eau de 100m3 chacune a la cathédrale de Muyinga et canalisation de l'eau des citernes vers le Centre des Enfants de la Rue et le centre pour handicapés |
Construction of water tanks Water distribution |
167 643 666 FBU | Diocèse de Muyinga |
Diocèse de Muyinga |
March 2009 |
2. | Construction d'une citerne d'eau de pluie de 30m3 au Lycee Don Bosco de Ngozi |
Construction of water reservoirs and installation of accessories
|
8 800 000 FBU |
Lycee Don Bosco de Ngozi |
Lycée Don Bosco de Ngozi |
Mars 2009 |
3. | Réalisation d'une installation de potabilisation de l'eau de pluie au Centre Agro-pastorale de Mutwenzi, avec 2 citernes enterrées de de 20m3 chacune et realisation de biogas a 2 digesteurs de 10m3 chacun et 4 bruleurs. |
Installation of a rainwater harvesting system Installation of biogas system |
16 600 000 FBU | Centre Agro-Pastorale de Mutwenzi |
Diocese de Muyinga DS 123 |
2008 |
4. | Construction d'une citerne d'eau de pluie de 30m3 à Kamaramagambo | Installation of rainwater harvesting system | 4 940 970 FBU | Paroisse Sacré-Cœur de Jésus | Economat-Diocèse de Muyinga DS 123 Bujumbura | 2012 |
Biogas installation
S/N | Contract | Nature of works | Amount | Client | Client's reference | Period |
1. | Réalisation d'une installation de biogaz de capacité de 16m3 au Centre pour les Enfants de la Rue "Mwizero" avec un brûleur pour une marmite (Muvero) et un brûleur pour une petite cuisinière |
Biogas installation Supply and installation of biogas burners. |
6 800 000 FBU |
Bureau Diocésain de Développement de Muyinga (BDDM) | Bureau Diocésain de Développement de Muyinga (BDDM) | Mars 2008 |
2. | Réalisation d'une installation de biogaz de 28m3 et 12m3 avec 5 petits brûleurs chez les Sœurs Benemukama Communauté de Gihanga, Province Bubanza. |
Biogas installation Supply and installation of biogas burners. |
12 471 084 FBU |
Sœurs Benemukama Communauté de Gihanga, Province de Bubanza | Soeurs Benemukama Communauté de Gihanga, Province de Bubanza | Feb 2010 |
3. | Installation d'un système de biogaz de 16m3 à la paroisse de Ruzo | Biogas Installation | 8 193 435 FBU | Paroisse de Ruzo | Diocèse de Muyinga DS 123 Bujubura | Oct 2014 |
Installation of biogas plants
S/N | Contract | Nature of works | Amount | Client | Client's reference | Period |
1. | Construction de 2 digesteurs de biogaz de 40 m3 à l’école secondaire STELLA Matutina de SHYORONGI | 11 948 750 RWF |
Ecole secondaire STELLA Matutina de SHYORONGI |
L’ASBL Congregation des Soeurs Penitentes de St François d'Assise au Rwanda |
2008 | |
2. | Installation of biogas system rain water collection and toilets in Kabeza umudugudu, Gicumbi District/RWANDA | 220 097 308 RWF | Rwanda Environmental Management Authority (REMA) | UNDP | 2010 | |
4. | Construction of biogas systems in various schools | Construction of biogas infrastructure & installation | 136 401 946 RWF | Ministry of Education | Ninistry of Education | 2011 |
5 | Installation of a biogas system (2x30m3 built in series) at Ecole Secondaire St François de Shangi | Construction of biogas infrastructure & installation | 23 338 500 RWF | Rheinland Palatinate | Office of the partnership Rheinland Palatinate-Rwanda | Apr 2012 |
6 | Installation of a biogas system of 80m3 (2x40m3 in series) at Shangi Primary School | Construction of biogas infrastructure & installation | 23 136 750 RWF | Rheinland Palatinate | Office of the partnership Rheinland Palatinate-Rwanda | May 2013 |
7 | Construction and installation of 26 bio-digesters plants, 105 toiletsand bathrooms, 210 cowsheds for Muyebe settlement in Rongi Sector, Muhanga District, Southern province. | Construction of biogas infrastructure & installation | 399 088 744 RWF | Rwanda Environment Management Authority (REMA) | Rwanda Environment Management Authority (REMA) | 2013 |
8 | Construction of biogassystem in Musanze Prison | Construction of biogas infrastructure & installation | 61 886 516 RWF | Rwanda Correctional Services | Rwanda Correctional Services | Dec 2013 |
Integrative biogas project
This proposal for the Integrative biogas project is solidly founded on the experiences of Biogas-Rec. We need expand our activities to a wider range of beneficiaries.
Our aim is :
· To provide
· Sound organic waste processing
· Clean renewable energy
· Sanitation
To produce
· Cooking gas
· Organic fertilizer
· Rain water harvesting
in an economically feasible and sustainable way
The Integrative biogas project’s
main elements
¡ Waste water collection for households
¡ Collection of organic waste from a slaughterhouse, schools in the area
¡ Treatment of waste to produce biogas
¡ Rain water collection and usage system for bathing, flushing toilets
¡ Distribution system for biogas for cooking
¡ Marketing of liquid and solid fertilizer product
Read more:
Can't see this document? Click Me
Urugero Local Biogas Network
We have started constructing biogas digesters in a densely populated area of Kigali to establish a local sewerage and solid waste treatment, while making secondary resources available.
BIOGAS-REC Ltd had an accelerating success constructing biogas digesters, water tanks and solar panels in Rwanda and Burundi since its foundation in 2007. The family business has constructed more than 70 biogas plants in Rwanda and Burundi, including three at the office’s location in Urugero.
As the company is located in Urugero it can respond firstly and more flexibly, and in addition, BIOGAS-REC Ltd has a total value in liquid cash and materials to cater for upcoming issues in the process.
Consultants who are working with Rwanda since many years, support the company in conceptualizing social mobilization, training and monitoring & evaluation.
The local authorities in Urugero neighborhood in Kigali are actively supporting the implementation of the project through involving the community. The Rwanda Environment Management Authority (REMA) has cooperated in previous projects of BIOGAS-REC. It will support this project with the acquisition of the permission of the project implementation as regards to environment safeguarding.
The local community of Urugero, which amount to about 1750 inhabitants has been consulted in a study carried out by Wageningen University in their needs towards a new sanitation system.
Read about the project:
Can't see this document? Click Me
Combined systems for biogas and rainwater harvesting
Combined biogas system plant
Most of the biogas plants in our country are individual, household level plants. With our policy of living in agglomerations (IMIDUGUDU) where households are closely spaced in the heart of the village and with the country line of GIRINKA MUNYARWANDA and other animal husbandry, this may contribute to the increment of the total number of household’s cattle’s and other bovine animals and the animals This may contribute to the adoption of a new system of combined biogas system plants.
Combined biogas system plant is a new system in our country where grouped houses (4+) are combining the same toilet and same cowshed with one digester where produced gas is distributed equally to everyone.
Within this system digesters are connected one to another with a pipe, having an advantage of sharing bacteria (anaerobic) and with some percentage of gas.
The design of these digesters depends on the location, the plant cannot be far off from the beneficiary and the size of the plants is primarily decided by the number of beneficiaries that signed up for the project. Special care has to be taken so that gas is supplied at each household with sufficient and equal pressure, irrespective of the distance of the household from the plant and the maintenance should be in hands of the cooperative in charge.
Read the document
Can't see this document? Click Me
Combined Rainwater harvesting system.
This system consists of constructing underground water tanks where water from different roofs is collected in. With our national policy of living in UMUDUGUDU where households are closely spaced in the heart of the village and with the problem of water shortage and sanitation, Biogas REC Ltd has established a system by which rainwater can be properly used and shared within the agglomeration. Before water reaches the tank, it first passes through a layer of natural filters. in this system, tanks are grouped, there is a centre where people come for fetching water at fixed place.
Read the document:
Can't see this document? Click Me